My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ =--Golder <br />_ .Associates <br />February 4, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 9: January 19 through February 1, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />. Quality Assurance (CQA) services performed for the Cresson Project during the period of January 19s' <br />through February 151, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 10° F to 29° F, and highs ranged from 35° F to 48° F. Snow was recorded <br />on January 28`h, 2003. Weather observations were made on ten days of this two week reporting <br />period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb and <br />c construction. Ames conducted Phase IVb and c construction activities on ten days of this fourteen day <br />reporting period (January 20t1i through January 24s', and January 27`s through January 315` ). <br />Construction activities conducted during this reporting period aze shown in site maps of Phase IVb and <br />IVc, located in Attachment A. <br />Phase IVb <br />Ames continued hauling and placement of Low Volume Solution Collection Fill (LVSCF) in Phase <br />IVb. Ames utilized a Caterpillaz 330 excavator with a baz attachment to taper the crest and shoulder <br />azea of the in-place LVSCF material. Hauling and placement of the LVSCF in the Phase IV PSSA <br />area was completed for the season on January 241h, and will resume in the spring of 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.