Laserfiche WebLink
=-Golder <br />-Associates <br />January 7, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 7: December Ol through December 21, 2002 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of December 15t <br />through December 2151, 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 12° F to 21 ° F, and highs ranged from 28° F to 51 ° F. Snow was recorded <br />on December 3rd, 4`h, 17`h and 18d', 2002. Weather observations were made on sixteen days of this <br />three week reporting period. <br />Construction S~opsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c constmction. Ames conducted Phase IVb and c construction activities on twenty days of this twenty- <br />one day reporting period (December 151 through December 2151). <br />Phase IVb <br />Polyflex had completed geomembrane construction for the year and demobilized from site on <br />November 30`x. On the Sd` of December, a 2-foot rock rolled down the south side of the 2:1 riser slope, <br />creating puncture and scratch penetration damage to the liner. On or azound the l0a' of December, a 2- <br />foot frozen fragment of ore material rolled down the northern side of the 2:1 riser slope. Golder <br />inspected the geomembrane and identified all damage prior to the remobilization of Polyflex on <br />December 131n. Polyflex performed repairs of the damage on December 13d', followed by vacuum <br />testing on Saturday, December 14d'. Documentation of the repairs and tests will be reported in the <br />Phase IV b certification report. <br />