My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 6 Page 2 003-2203 <br />• tested. Destructive extrusion seam samples DX-17 through DX-25 were mazked, removed, and tested. <br />Polyflex completed geomembrane construction for the year and demobilized from site on November <br />30~'. <br />Ames began placement of Low volume solution collection piping on November 12~'. Ames placed fl- <br />inch PCPE pipe in the locations defined by the drawings. <br />Ames commenced placement of Low Volume Solution Collection Fill (LVSCF) in Phase IVb on <br />November 11`" by building 10-foot haul roads into the Phase IVb PSSA. <br />Ames re-excavated the PSSA sump and placed Soil Liner Fill (SLF) as required prior to the <br />installation of geosynthetics. Ames excavated the LVSC riser trench and performed anchor trench <br />excavation activities after all SLF was in-place. Ames conducted five Depth Verification Tests <br />(DVT) SLF that was placed in the Phase IVb sump azea. <br />Ames continued backfill of the interior anchor trench along the 9606 road on the Phase III ore slope at <br />the completion of geomembrane QA testing. Ames backfilled approximately 700 lineaz feet of anchor <br />trench. <br />Phase IVc <br />Ames performed excavation remediation activities for underground workings UNK-1Q UG-234a, <br />• UG-243, UG-236, UG-506, and UG-546. <br />Ames performed confirmatory drilling activities associated with the Phase IVc construction area on <br />underground workings UG-304, UG-498, and UNK-18. <br />Ames placed Structural Fill (SF) over previously remediated workings at UG-227, UG-511 and UG- <br />512 and installed Coarse Shaft Backfill (CSB) at UG-221, UG-498, and UG-304. <br />Ames placed Concrete Plug materials (CP) at UG-221, UG-500, UG-502, UG-503, and UG-506. <br />Ames performed blasts at UG-297 and UG-234. <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed and documented excavation remediation activities associated with the Phase IV <br />underground working construction. Workings were designated as "Shallow or Deep" as defined in <br />the drawings and will be remediated accordingly. <br />Phase IVb O6 tiov10-30 Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.