My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase [Vb Weekly Summary No. 4 Page 2 003-2203 <br />• over an area of 64,048 squaze feet, and deployed 100-mil DST LLDPE geomembrane over an area of <br />16,246 squaze feet in Phase IVb during this reporting period. Geomembrane panels L363 through L385, <br />P386 through P395, L396 through L437, and M438 through M466 were deployed, seamed, and tested <br />by Poly-Flex. Destructive fusion seam samples DF-99 through DF-129 were mazked, removed, and <br />tested. Destructive extrusion seam samples DX-10 through DX-13 were marked, removed, and tested. <br />Ames continued placement of Structural Fill (SF) in the Phase IVb azea. Ames placed SF above the <br />Phase IVb sump. Ames also continued scope recontouring in the Phase Nb area on Substation Hill, on <br />the PSSA floor, and on the Phase III ore slope. <br />Ames conducted SF blasts in Phase IVb near station 14+00 of the permanent diversion channel on <br />October 16~' and 25's at 17:00 and 12:15, respectively. <br />Ames continued placement of Bedding Fill (BF) over the existing Phase III ore slope in preparation for <br />geomembrane deployment. Ames placed one foot of BF from the edge of Phase III liner to the 9606 <br />bench. <br />Ames continued excavation of the interior anchor trench along the 9606 road on the Phase III ore <br />slope in preparation for geomembrane deployment. Ames excavated approximately 500 linear feet <br />of anchor trench. <br />Ames resumed construction of Phase IVb Leak Detection Trench (LDT) starting near the PSSA East <br />• end berm and working South. Ames excavated approximately 300 feet of LDT. <br />Ames resumed placement of Drain Cover Fill (DCF) at the PSSA West end berm. Ames placed two <br />feet of DCF over previously placed 80-mil LLDPE geomembrane in preparation for end berm <br />construction. <br />Phase IVc <br />Ames performed excavation remediation activities for underground workings UG-291 and UG-498. <br />These workings were observed and verified to be "Deep" as defined in the drawings and will be <br />remediated accordingly. <br />Ames performed confirmatory drilling activities associated with the Phase IVc construction area on <br />underground workings UG-308, UG-309, and UG-310. <br />Ames placed Cemented Rockfill (CR) at UG-270 and UG-292 by tapering the workings and placing 7 <br />feet of CR in accordance with IFC Drawing 12, Detail 1. <br />Ames resumed placement of Coarse Shaft Backfill (CSB) into "Deep" workings at UG-500, UG-502, <br />UG-503, and UG-504. CSB was placed in prepazation for Concrete Plug construction. <br /> <br />rn„e ~w o~ a. ~ ~-~6 Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.