My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Golder <br />ASSOC12lteS <br />October 29, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />12E: Summary No. 4: October 13 through October 26, 2002 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />• Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of October 13s' <br />through October 26"', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 22° F to 36° F, and highs ranged from 49° F to 69° F. Snow was recorded <br />on October 22"d 23rd, 24`h, and 26`h, 2002. Weather observations were made on twelve days of this <br />fourteen day reporting period. <br />Construction Synopsis <br />.~tnes Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb and <br />c construction. Ames conducted Phase IVb and c construction activities on twelve days of this fourteen <br />day reporting period (October 14s' through October 19a' and October 21S` through October 26~'). <br />Phase IVb <br />Ames continued to haul and place Soil Liner Fill (SLF) in the Phase Nb PSSA and at the PSSA west <br />end berm. Ames conducted five Depth Veritication Tests on placed SLF. <br />Poly-Flex continued deployment of 80-mil single-sided textured (SST) LLDPE geomembrane, 100-mil <br />SST LLDPE geomembrane, 100-mil smooth LLDPE geomembrane, and began placement of 100-mil <br />• double-sided textured (DST) LLDPE geomembrane in Phase IVb. Poly-Flex deployed 80-mil SST <br />LLDPE geomembrane over an area of 38,906 square feet, deployed 100-mil SST LLDPE <br />geomembrane over an area of 134,421 square feet, deployed 100-mil smooth LLDPE geomembrane <br />
The URL can be used to link to this page
Your browser does not support the video tag.