Laserfiche WebLink
Phase IW Weekly Summary No. 3 Page 4 003-2203 <br />• Laboratory Tests <br />Golder obtained one sample of Bedding Fill (BFb-O1) and two sample of Soil Liner Fill (SLFb-OS <br />and SLFb-06) for laboratory testing. The samples tested met the requirements of the specifications <br />and results aze presented in Attachment B. <br />Meetin¢s <br />CC&V held Weekly Contractors meetings on October ls` and 8a'. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on October 15`h, 2002 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />. Bob Nichols <br />Resident CQA Monitor <br />rn,uiwo~srorzs-oniz Golder Associates Inc. <br />