My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 4 Page 3 003-2203 <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed placement of SLF and BF in Phase IVb for subgrade preparation, thickness, <br />compaction, moisture content, and materials. Golder conducted eleven in-situ density and moisture <br />content tests to verify SLF placed complied with the specifications. Golder observed five depth <br />verification tests performed by Ames. <br />Golder observed and documented remediation activities associated with the Phase IV underground <br />working construction. Workings were designated as "Shallow or Deep" as defined in the drawings. <br />Golder observed placement of CSB and CR for underground working remediaion. These materials <br />were placed in accordance with the drawings and specifications into excavated or open underground <br />workings. Golder previously obtained samples of SF, Select Structural Fill (SSF), CR, and Concrete <br />Plug (CP) for laboratory testing. Materials supplied met specifications. <br />Golder observed excavation of the geomembrane anchor trench for proper dimensions. <br />• Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in Phase IVb met specifications. <br />Golder observed and documented confirmation drilling activities associated with the Phase IV <br />construction. Full-time monitoring was given to confirmation drilling of underground workings, <br />including logging holes, marking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Golder observed excavation of the LDT in Phase IVb for proper dimensions and slope. Excavation <br />met the requirements of the drawings. <br />Golder observed the placement of DCF in the Phase IVb area. Golder had one CQA monitor per <br />dozer to observe DCF placement. <br />Laboratory Tests <br />Golder obtained one sample of Structural Fill (SFb-14) and one sample of Bedding Fill (BFb-02) for <br />laboratory testing. The samples tested met the requirements of the specifications and results are <br />presented in Attachment B. <br /> <br />Phase I Vb 04 On I3 .6 Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.