My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F'hasc 14'6 11'.ekly Summan ~o. 3 Page' 003-'_'03 <br />• >ramed, and tested b} Pol)-flex. lhstnrctive fusion setup santp-es DF-V7 thmugh DF-9S weer murkrd. <br />n•moved, and tested. Destnutive extrusion scam samples DX•01 thmugh DX-09 were marked, <br />removed, and tested. <br />:1mrs amtinued placement of Stntcatral Pill (SFf in the Phase IVb area. Ames placed SF at the Pharr <br />IVa'1\'b tie-in. at the Hhase 14'h !'SSA Ilour, and above the Ph:ru 14'b sump. Ames also continual <br />slope trcontuuring in the Phase IVh area on Substation Bill, on the northern PSS:1 slope, in the PSS:1 <br />Iltxrr, :utd an the Ph;tse Ill ore slope. <br />Anus conducted SI•' blasts in Phase IVh near station 1400 of the prmtattent diversion channel on <br />(ktolxr 2nd and ~`~ at 17:00. <br />Ames Fagan placement of Bedding Pill (BP) Duct the existing Phase I11 ore slope on Srptemtxr 30`s in <br />preparation 1'ur geontrmbranr deplo)'ment. Ames placed one foot of BP liom the edge of liner to the <br />9(i0(i bench. <br />:1mes continued rxrn•ation of the interior anchor trench along the \nrthem limit of the Pharr IVb <br />PSS:1 in preparation liar ga~mcmhranc deplo}•ment. :4mes excavate) approximatch' 1,000 linear <br />feet of:mchor trench. <br />\ntes perfomtcd confirmatory drilling activities associated with the Phase IVb rnnsttvction area on <br />andcrground working UG-490. <br />• \mcs installed t;ndrrdrlin Pill into a ~' wide h. '_' deep by 40' long trench along the 31LI4' slope <br />lust alxrce the PSSA sump area and connected this trench to a 14' deep b) 4' square sump excavated <br />just north of the PSS:1 swnp. I he sump was also bucklilled with t`ndcrdrain Pill and its bottom wus <br />excavated to an Ae~atiun appnrximately ~' below the PSS.A sump Aeration. :111 of the Underdrain <br />Pill placed seas awered with approxitttatrly I' ofSF'. <br />Phase IVc <br />Ames prrtitrmed excavation repudiation activities for underground workings l;(i-2G9. F ~(;-279, and <br />l'G-498. These workings were observed and verified to be "lhcp" :ts defined in the drawings and <br />will he rcntcdiutcd accordingly. <br />Ames perfixmed confirmatory drilling activities associated with the Phase IVc construction urea on <br />underground working i rG-291.:\mcs blasted wurl.ings locatc.l at [ ~G-291 on Oewher 1 I'" at 12:00. <br />:1nu resumed placement of Concrete Plug tCPI concrete into "Lkep 5hatis" l~(i-_'79, lIG-28R.^_89, <br />and I'G-292.:\mcs placed three titi of autetttr in accordtuur with IF(' Urtw ing 12. Detail I. <br />Anus plated C'ruunted Rcxktill (CR) at L'(i-274 h}' tapering the warl:ings and placing 7 feet of CR in <br />aceonlanc. with Ilt 1)r:acine I'_. Detail 1. <br />• Mal'^I'~a~ill ti~' IRI,t >~ia~,~l\N,~Il. ii1,J>.Ill tl.•^.I tl-`11?(. a(Illt ~~-l <br />w. nbol+ea]x~nC Goldor Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.