My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ... <br />., <br />' ~ Golder <br />Associates <br />t )crobcr I J. 't n)' <br />11r. Rnn Rt+herts <br />Cripple Creek ~K: Victor Gold Mining Compam <br />P.U. I3ox 191 <br />27ii Stag F{ighway 67 <br />Victor. CU 80860 <br />(iuldcr :~ssuciatcs Inc. <br />9~ l tniun E~uulecard. Suite 300 <br />Lakewood, CO R(1_28 <br />t3it3i 98n-oa~o <br />(3U31'+8~-'_'1180 <br />Golder Pm.lect Nu.: llt)3-"t13 <br />RI{; Summon \u. }: Scplcmhcr 29 thruu~h Octnbcr 12. ?1111? <br />( Yc+son I'rujcct I'hu+c I~'b, c Consuvctiun Quality :~ssurancc <br />[)ear tilt. Roberts. <br />• t ~~+lder Associates Inc. (Golden is plea~eJ to submit this summary of Phase IVh and c ('unstntctiun <br />~ hcdity .lssurance (('Q:~; scniccs perli,rrned tier the Cresson Project during the peri+xl of September <br />,`~'~' through Uctnbcr I2tn, 2(.N)Z. <br />the weather during this Cepurting period was clear to cloudy. Approximate day-timc low <br />temperatures ntnecd Irnm 29= h to ~I° P, and highs ranged from ~[~` f to 70° [~. Rain was n~corded <br />on Septemher 3(I~', Uctohcr'_"'' ~'"', and 8`n, 2002. 11'eather ohsenatiuns were matte on t+veh•c d;qs <br />of this tixtrtecn day reporting period. <br />Construction Svnoosis <br />:1mes Construction Inc. IAmcsl of:\ururt. Colorado is the earth++~uks contnctur ti+r the Phase IVh and <br />c construction. Ames conducted Phase IVb and c construction acticitics nn h+zlve da+s of this fourteen <br />day reporting period ISeptemtx:r 3U'n through Uctoher >'n and Uctulx:r Tn through October 12`nl• <br />Phase IVh <br />\mcs continucwl to haul and place Soil Liner Pill ISLF'1 in the Pharr IVb PSS:1 and at the PSSA west <br />end bernt. Ames conductal elc+en Depth ~'eriticatiun'I'ests on placed SLF. <br />Poly-Ples continued deployment of IOo-mil single-sided tretured (SST) t_Lf)PF' geumemhranc and <br />began deployment of I(H)-mil smooth LLDPF. guimembrane in the Phase IVb PSS:~. Poly-h'Icx <br />• +icplovcd I (tt)-mil SS"f I I UPP geomcmhrane over an area of 221 .d 34 squ;ve feet and deployed 100-mil <br />.mouth LI I)PF. grumcmhrute u+er an area of 8.1.209 square feet in the 1'hasr IVb PSSA during this <br />rclwrting period. Geomcmhrane panels L?54 through L3b_ and 11'31 through 1C>3 +vcre deployed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.