My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ph.~sc IVb 1VccMly Summan \u. ? Page S 003 ??03 <br />• (iulder observed and documented remediation acti+ities associated with the Phase IV underground <br />++urking construction. Workings were designated as Shallu++• or Deep as defined in thr drawings. <br />G01dei OhSCI'VCd plaeemCnl of Sp. SSI~. CSR. l'P. and CR fix underground ++urring rrntcdiaiun. <br />'hhese material; +verc placed in accordance with the drawings and specifcations into exca+•ated or open <br />underground wurl:ines. Golder previuush~ obtained s:unples oC SSP, CS13. CR, and CP fix laboratory <br />testing. M;rterials supplied met specifications. T'etracon conductctt field testing and sarnpling of CP <br />cunctete as per specifcations. and ++•ill supph 2R-dad strength results. <br />(;older vbserved constntction of LDl' in Phase IVb fix trench dimensions, slope. and materials used. <br />Golder obsen cd exca+ation of geomembrme anchor trench fur proper dimensions and depth of 5LF <br />exposed in the anchor trench. <br />Golder observed geomembrane deplo~mcnt, documenting antbicnt air temperature. panel <br />dimension.. seaming, tic-in o+erlap. and :cam testing (trial scams, pressure. +ncuum, and <br />destntcti+~el. Geomemhrane placed in Yhase IVh met specifications. <br />I.ahar,u,~n I r+l~ <br />Golder ubtaineJ one sample of Structural Fill (SFb-li) and two sample ul tioil Liner fill (~LFh-O? <br />• ;,red SLFb-0~1) tix labc,ratun testing. The samples tcwtcd met the reyuircnunts of the specifications <br />:,red results arc presented in :\ttachment {.~. <br />\Irctt~gs <br />('CKV held a Weekl} Contracture nuetings un September I T° and .4'". Items discussed included <br />Saf'cty. Eat+imnmcntal. Schedule, and CQ:\. the next weekh meeting +sill be held on UcWher 1''. <br />?00'_ at 11):(1(1 ;1ti1. <br />(iulder Personnel nn-Site <br />A sumnuin of all Golder C(1:\ personnel on site during this reporting period is presented in <br />Attachment (:. <br />Sincere(}, <br />Itob Nichols <br />• <br />~...,+~us.~~•>:. Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.