Laserfiche WebLink
Phax IVb N'rekly tiummary No. 2 Page ? 003-?3U? <br />• I ~?0 were drpluv~d. seamed, and tested by Poly-Flex. Destructive fusion seam samples Df~-33 through <br />\mes continued placrntent ol'Stntcutral Fill ISF) in the Phase IVb area. :\mes pluccYl SF at the Phase <br />IVaIVh tie-in and alxnr the Yhase IVb sump. Ames nlsr~ continued slope recontuuring in the Phusr <br />IVb area on Substation Hill. on the notthem PSSA slope. in the PSSA Iluor. on Chicken hawk Hill. in <br />the PSS.4 b1'cst 1-:nd Brnn, and on the Phase 111 ore slope. Ames also placed SI~ into 1'(i-d91 and <br />l iNK-1 j. <br />Ames continued constntction of the leak Detection Trench lLU'f) in Phase. IVb along the North slope. <br />of the PtiSA. Ames constructed approximately d00 feet of LDT. <br />:\mes amtinurd excavation oC the interior anchor trench along the Northcm limit oC Phase IVb <br />PtiSA in prrparttion for geumrmbrnne deployment. Ames exrtvnted approximately 1,200 Pert ul' <br />anchor trench. <br />:Ones resumed placement of Concrete Plug fC'1') concrete into "Deep ShatY' UCi-d93. r\mes placed <br />three fret of concrete in accordance with IFC Drrwing I ~. Detail 1. <br />,tares placed Centrntrd Racklill (CR) at UG--{9:, by tapering the workings and placing 7 fret of CR in <br />accnrdnnce with IFC Drawing 12. Detail 1. <br />• I'ii;ise IVc <br />Mlle] continued placement of Coarse Shalt Rackfill (CSBj into "Ueep" wrdergmund working UG-270. <br />\mes resumed placrntent ul' Concrctc Plug LCP) concrete into "Deep ShafL;" UCi-270 and L'G-27~. <br />Ames placed three feet of concrete in accx+rdancc with IFC Drawing 12. Detail I. <br />.Ames continued placement of Select Structural hill (SSF) into UG-270, UCi•28G. and UG-291. <br />Ames constructed a gengrid cap over LINK-09. :\mes placed hvo layers of geogrid in accordance with <br />the drawings and sprcilicntions. <br />Field \lonitoring and Testin~,4cti~ hies <br />Golder uhsened constntctiun activities associated with Phase IV rurthwurl.~. All construction <br />materials and soil materials placed wen verified as suitable, and constnrction methods were in <br />accordance with project sprciticatiuns. Removal of uccrsized and deleterious material from all till <br />arras was ohscn•ed. Golder obsencd Structural Pill (SF) placement in Phase IV tier materials. lift <br />thickness, moisture content, and campactive etlbrt. <br />(iulder obscned placement ul' SLP in Phase IVb fur subgradr preparation. thickness, contpnction, <br />nwisturr content. and ntatrrials. (iulder conducted thirty in-situ density and moisture content tests to <br />• ~rril} ~I F placed complied with the specifications. Golder observed 19 depth verification tests <br />~erAmned by :\rnrs. <br />I )h-t,t,. ,ren• m;rrkcd. rrm,ne.l. and tested <br />rn.,.,eew k,,, .. ~ Golder Associates Inc. <br />