My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phan IVb Weekly Summary No. I Page? 003-2203 <br />• un the Phase 111 ore slope. <br />\mrs continued clearing and grubbing in Phase IVb un Suhsunion Hill. -fop.nil was su~ipprd and <br />:n~ckpilyd locally in preparation tier relocation nr a prrrnanent topsoil stockpile. :\mrs horded <br />nvcrsire material t?om the Phase IVb area to an uncuntn:dled till site and drletcricws nmtcrial to <br />Upper Areyua Gulch. <br />:\rnrs continued construction oi'tbe Lctk Detection Trench (LUT) in Phace tVb along the North slope, <br />Ames cunstructrd approximately ~(lU I~'zt of LD I . <br />Ames completed placement of DCF over previously deployed geomembrane at the PSSA west end <br />bcnn. <br />Ames resurned undcrdrain construction by constructing Sc~;undary and Tertiary underdrains near the <br />nc++ LOR. Ames ronstnrcted approximately I'_D feet of Secondary undcrdrain and appro~imatcly 80 <br />Pert of 1 crtiarv undcrdrain. <br />Ames resumed DCF rentuval Crum the edge of the Phase IVb liner in prcparaliun liir Bedding Fill <br />plucrmant. <br />\mcs prrfomud excavation renudiatinn activities cur underground +vurking l l(.-493. This uurking <br />~~as observed and verified to be "Deep" an dctincd in the dra+vings:md will tx rcmcdiatcd accordingly. <br />• \mcs resumed placement of ('oncrcte Plug (('PI wnrretz into "Deep Shaft" UG-493. rimes placed <br />lhmc feet ufconcretc in uccorciance with IPC Drawing 12. Dctoil 1. <br />:\mes placed C'cmcntcd Rocklill (CR) at l Ci-493 and U(i-2t,3 by tapering the workings and placing 7 <br />leer ufCR in accordance +vilh IFC Drawing I _'. Detail I. <br />r\mrs continued placement of Caarsc Sh:rli l3acktill (C'Sltl into "Dacp" undrrgruunJ ++;rrking t ~G-1'i <br />.~mcs continued placement of Szlect Structural Fil I (SSF) into l tG-381 <br />Phase I\'c <br />:\me> performed confirmatory drilling activities associated +cith the Phase IVc construction area on <br />underground working l~G-274. <br />Ames pcrfonned excavation rentediatiun activities for underground +curkings C'~G-_74. UCi•279, and <br />l~(i-270. lltrse workings +errc uhxryed and veritird to be "Shallow ur Dcxp'", as defined in the <br />drav+ines, and will lx mmcdiatrd accardinglc. <br />Ames placed ('emrnted Rocklill ((.'R1 at l'(i-'_7? and IJNK-08 by tapering the workings and placing 7 <br />I'ect oCCR in acairdance with IFC' Dra++ing 13. Detail 1. <br />• <br />.,.nun wy~~.~,.,~~ . Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.