My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phucr 1 V b vt erkly tiummary ~o. I Pagr 3 OOi•'?03 <br />• I iei,i 11~~narriit ~,m;1 Ir;tin~~cL~iti~; <br />Golder observed construction activities associated with Phase IV earth+corks. All amstructiun <br />materials an:l soil materials placed were verified as suitahle. anJ construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material t}um all till <br />areas ++.z., ohserveJ. Golder ohsened Structural mill (SF) placement in Phase IV fur lilt thickness. <br />moisture content, and compactive cflitrt. <br />Golder observed placement of SI F in Phase IVh fix suhgrade preparation. thickness. and materials. <br />Golder observed and ducuntcnted cscavatiun and remediation activities associated with the Phase lV <br />underground working avtstnrctiun. 11'orkings were designated as Shallow or Deep as delined in the <br />drawings. <br />Golder observed placement of SSF, CS(3, C'P, and CR for underground working rcmediaion. "ITtese <br />materials were placed in accordance with the Jrnvings and specilic:uions into cxcavatud or open <br />underground workings. (ioldcr previously obtained samples of SSF, CSE~, C'R. anJ CP fix lah<.ratory <br />ttwting. ;vaterials supplieJ ntet specifications. lerrucon conducted field testing and smnpling of CP <br />concrete as per specifications, and will supply'8-day strength results. <br />Golder observed and documented confirmation drilling activities associated with the Phase N <br />constnuction. Full-time monitoring +vas given ut contirntation drilling of underground workings, <br />• including logging holes. marking drill locations. surveying holes, and documenting underground <br />workings encountcrcd. <br />lhtlder visually uhserved the placement of DCF in the Phase 11'b area. Golder had one C(1A monitor <br />p.r dozer to uhservr DCP placement. <br />(ioldcr provided ILII tintr ubservntion ul' D('P removal along rho edge of the Phase 11'b liner. <br />Golder m:ukcd any liner damage that .wcurred outside of the overlap. <br />Golder obsen ed cunstnrctiun of LUl in Pharr IVb for trench dimensions. slope, and materials used. <br />Golder uhxrved construction of Secondary and Tertiary underdruins For proper trench dimensions, <br />slope, materials, gattextile over-lap. and material thickness. <br />Labunturv Tests <br /> <br />(.holder uhtaineJ one sample of Stntctural Fill 1SFh-I_j ;md one sample of l ~nderdrian Fill tI'Fh-02) <br />for laboraton testing. fhe samples tested met the rrcquircments of the specifications and results are <br />presented in :1ttachment [3. <br />\1_etin>s <br />• ('CxV head a Weekly Contnetors meetings on September 3rd and IU°i. Items discussed included <br />r~nem ~~ ~.,... Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.