My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. . <br />~~ <br />' • Golder <br />1~SSOC121teS <br />Scptenthcr 17, 002 <br />\7 r. Ron Roberts <br />('ripple ('reek .~ Victor Gold 'vtining Compam <br />P.O. E;ux 191 <br />2715 State I lieinvay 67 <br />Victor, Cl) R03(,0 <br />(ioldcr A5501'18tCS Inc. <br />a~l lLtiun i3oulevard. Suite 300 <br />Lakewood, co so~?s <br />(3031 ~)su-o-I~o <br />13(131 9R?-_'USO <br />Cioldcr Project No.: 1)03-"0': <br />I2F.: Sumntan No. I::\u~uzt ill throu{;h September 17, ?11112 <br />('ressnn 1'rujcct I'hasc IVb, a ('unstructinn (lualih :\ssnr:tncc <br />lkar \tr. IZ„fkns. <br />• (ioldcr asstxiates Inc. (Golder) is pleased to submit this swnnmry of Phase lVb and c Construction <br />(,)uulity :\ssurance ICQ.4) sen ices pertbmted for the Cresson Pmiect during the period of August 30°i <br />through Scpletttbcr 17°i, 20U'. <br />~Fhe w~;uher during this reporting period was clear to cloudy. .\pproximute daytime logy <br />temperatures ranged liom 39° F to 55° P, and highs ranged from a9° F to 84° F. Rain ~~as recorded <br />on September 9°i. 10"', 12`n, and 13i1', 200. \\ either observations ~~rrc made on ten days u( this <br />sixteen dap reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (;\ntesl of Aurora, Color<rdo is the earthworks contractor tier the Phase I\'b and <br />c construction. Antes conducted Pharr IVb and c construction activities on ten days of this sixteen day <br />reporting period (August 30'', September +id through Septentltcr fi°', and September 9`n through <br />September I3'"j. <br />Phase IVb <br />Antes continued W haul and place Soil Liner Fill (SLP) in the Phase IVb PSS:1. <br />Nn geomembrane was deployed in Phase IVb during this reporting period. <br />• \me~ continued placement of Structural Fill ISF) in the Phase I\'h area. Ames placed SP m the Phase <br />I\ ;r IVb tic-in and alwcc the 1'hasc IVh sump. Ames also continued slope recontouring in tlu Pha~c <br />I\'1+;uea on Substation Ilill, rnt the northern PSSr\ slope. in the PSS:\ tloor, on Chicken Hawk Flill, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.