Laserfiche WebLink
CIRCES Cost Estimating Software <br />State :Colorado <br />County :Gunnison <br />Site :Lucky Strike Lode <br />Agency or organization name :DRMS <br />Permit or other job action :Reclamation <br />estimate for SO-Ol 2007 <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization _ <br />Cost Breakdown : Ownership cosUhour : $73.28 NA <br /> Operating cosUhour : $99.23 100 <br /> Ripper op. cosUhour : $1.88 25 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $207.18 Total fleet cosUhour : $207.18 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,889 CCY factor : 1.165 volume : 10,356 LCY <br /> <br />Source of estimated volume :120,000 sq feet of tailing pond X 2 feet of material <br />Source of estimated swell factor : na <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 737.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted /ill or embankment Spoil pile : 0.80 (fnd-rfJ _ <br /> Push gradient : 1.05 (Cat HB) _ <br />Average push gradient : 2.00 % (neg) Altitude : 0.95 (Cat HB) <br />Average site altitude : 9, 000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight 2 900 Ibs/LCY Net correction : 0.35 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />. .. :. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Adjusted unit production : 260.34 LCY/hr <br />Adjusted fleet production : 260.34 LCY/hr <br />Unit cost : $0.796 /LCY <br />PermiUjob# : M-1982-020 <br />Abbreviation :none <br />Filename : M020-05a <br />Total job time : 39.78 Hours <br />Total job cost : $8,241 <br />