My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-14_REVISION - M1982020 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982020
>
2007-08-14_REVISION - M1982020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:15:53 PM
Creation date
11/21/2007 4:42:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982020
IBM Index Class Name
Revision
Doc Date
8/14/2007
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Lucky Strike Lode
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :DRMS <br />Permit or other job action :Reclamation Liability Estimate for SO-Ol 2007 - <br />Task description :backfill and grade pond area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9U (2005) Horsepower : 405 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % _ <br />- <br />Cost Breakdown : Ownership cosUhour : $73.28 NA <br />Operating cost/hour : $99.23 100 <br />Ripper op.cosUhour : $1.88 25 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $207.18 Total fleet cosUhour : $207.18 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 BCY factor : 1.330 volume : 6,650 LCY <br />Source of estimated volume :accepted volumes from previous estimate <br />Source of estimated swell factor : na <br /> <br />HOURLY PRODUCTION ~ Job Condition Correction Factors ~ ~ Source <br />i <br />Average push distance: 200 feet <br />Unadjusted hourly production : 737.1 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 4.00 % (r <br />Average site altitude : 9,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.09 <br />Altitude : 0.95 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.37 <br />(Cat HB) <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 271.87 LCY/hr <br /> Adjusted fleet production : 271.87 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 24.46 Hours <br />Unit cost : $0.762 /LCY Total lob cost : $5,068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.