Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 06a <br />Date : 08/08/2007 <br />User : GRM <br />Slate :Colorado <br />County :Gunnison <br />Site :Lucky Strike Lode <br />Permit/job# :M--1982-020 <br />Abbreviation :none <br />Filename : M020-O6a <br />Agency or organization name :DRMS <br />Permit or other job action :Reclamation Liability Estimate SO-01 2007 <br />Task description :place 1 foot of topsoil over pond/tailings .... __..: ~ - <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9U (2005) Horsepower : 405 <br /> Blade type : Univer§at <br /> Attachment no. 1 :ROPS Cab Shift basis : 7 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $73.28 NA <br /> Operating cosdhour : $99.23 100 <br /> Ripper op. cosUhour : $1.88 25 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost/hour : $207.18 Total fleet cosUhour : $207.18 <br />MATERIAL QUANTITIES <br />initial Swell Loose <br />volume: 8,815 CCY factor : 1.125 volume: 9,917 LCY <br /> <br />Source of estima ted volume :estimate from maps and plans <br />Source of estimated swell factor : na <br /> <br />HOURLY PRODUCTION Jo4 Condition Correction Factors Source <br /> Operator skill: 0.75 (avg.J <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 737.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.j <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.05 (Cat H8J <br />Average push gradient : 2.00 % (neg) Altitude : 0.95 (Cat HB) <br />Average site altitude : 9,000 feet Matedal weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.49 <br />Weight description <br />