Laserfiche WebLink
<br />In addition, fill placed beneath the synthetic liner shall be <br />tested on the same schedule for permeability by insitu methods. <br />1.3 Oualitv Assurance Tests <br />Tests to be run for quality assurance are listed in the <br />following sections. Tests not listed may be run at the direction <br />of the Engineer. The Engineer or his representative will designate <br />the materials to be tested and the tests to be done. <br />Typical Representative Tests <br />• Compaction tests; <br />• Atterberg Limits; <br />• Grain size distribution; and <br />• Specific gravity. <br />Typical Construction Control Tests <br />• Moisture-density test w/nuclear gage; <br />• Moisture content; <br />• Rapid compaction test; <br />• Grain size distribution; and <br />• Atterberg Limits. <br />Acceptance/Re.iection Criteria <br />Berm Fill <br />Minimum allowable density = 95% of maximum dry density <br />Moisture content 2% dry to 27e wet of optimum <br />