Laserfiche WebLink
protection of existing monitoring wells designated for protection. <br />• Prior to construction start-up, the Contractor shall familiarize <br />himself with monitoring well locations and clearly mark each well, <br />as needed, to prevent accidental damage. In no case shall damage to <br />the monitoring wells be permitted; and if such damage does occur, <br />all repairs or replacement, if required, shall be at the expense of <br />the Contractor. <br />• , <br />• <br />15 <br />