Laserfiche WebLink
rubbish and the manner and place of disposal. All material furnished <br />• for the execution of the work and thereby purchased by the Owner <br />shall remain the property of the Owner. <br />The Contractor shall clean out all installations and tear down <br />and remove all temporary structures built by the Contractor. Any <br />existing structures or installations shall leave the site area in <br />a condition at least as good as the condition prior to construction. <br />The Contractor shall also grade the construction site to provide <br />proper drainage and give a sightly appearance. <br />The final condition of the construction site is subject to the <br />approval of the Owner. <br />• 1 <br /> <br />10 <br />