My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:55:24 AM
Creation date
11/21/2007 4:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX J TECHNICAL SPECIFICATIONS
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In preparing the work sequence, the necessity of obtaining <br />• borrow from mandatory excavations within the disposal area and areas <br />subsequently requiring fill placement shall be considered. Synthetic <br />liner placement shall be coordinated with subsequent drain pipe <br />installation, liner bedding placement, starter berm and cell berm <br />construction, and drain fill operations. <br />The following is a suggested general work sequence for <br />constructing the facilities shown on the Drawings. It is intended <br />as a guideline for the Contractor to develop his own work sequence <br />in conjunction with that of the Owner to suit construction equipment <br />and manpower scheduling and meet design requirements. Additional <br />activities required to complete the work, as outlined within the <br />Specifications and as shown on the Drawings, shall be added by the <br />Contractor. Should the Contractor develop a sequence which would be <br />more acceptable to the Owner, Engineer and himself let him present <br />it. <br />• ~ Develop access roads to work areas, as needed. <br /> • Develop a site drainage plan and maintenance scheme. <br /> • Construct the diversion ditch above the disposal area <br /> to route upstream storm runoffs around the facilities. <br /> • Remove topsoil from the facility area and place in <br /> stockpiles outside the ultimate disposal area limits. <br /> • Prepare the embankment and tailings disposal area <br /> foundation areas for liner installation. <br /> • Install synthetic liners within prepared disposal area <br /> where construction traffic is no longer required. Liner <br /> placement shall be done in segments, as approved by the <br /> Engineer, to minimize construction traffic over the liner <br /> to install the drain systems and berms. <br /> • Install drain pipes, liner bedding material, and the <br /> main and splitter berms over the synthetic liner. <br /> • Construct the lined collection pond facilities. <br /> • Construct the lined collection ditch and berm from the <br />• embankment to the pond. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.