My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-03_REVISION - M1996076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996076
>
2003-04-03_REVISION - M1996076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:08 PM
Creation date
11/21/2007 4:02:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
Revision
Doc Date
4/3/2003
Doc Name
Adequacy Response
From
Walter Aldridge
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMEO GRAVEL <br />EXHIBIT D <br />MINING PLAN <br />Middle Mine Area (42.0 Ac. affected area) <br />The sequence of proposed activities in Middle Mine Area are as follows: <br />Phase 1: <br />The starting point of excavation for the proposed (112) permit will be within the <br />existing (110) permit area (9.55 acres) located in Parcels 2 and 3 which is <br />currently being mined (See Exhibit C). <br />Phase 2: <br />Western Slope Flagstone intends to continue mining and reclaiming the existing <br />(110) site in 2 acre phases. <br />Phase 3 and future Phases: <br />The proposed mining operation wiA continue in a northwesterly direction to the <br />limits of the middle mine plan {See Exhibit C). <br />The start-up time of the first phases is estimated to take 2-4 years to allow for <br />preparation of storage and sales yard area and haul road improvements. The <br />remaining phases are estimated to be completed in 2 year intervals, depending <br />on market demand. <br />North Mine Area (25.9 Ac. affected area) <br />The sequence of proposed activities in North Mine Area are as follows: <br />Phase 1: <br />The starting point of excavation within the North Mine Area will be the site <br />preparation for materials, equipment and fuel storage, scales, sales yard and <br />crusher (approximately 2 acres). Site improvements will remain for future use <br />after the life of the pit, and will not be reclaimed. It is estimated that the majority <br />of the materials removed from Phase 1 will be used for haul road improvements. <br />Phase 2: <br />As more materials are needed, the mining will continue in a southerly direction to <br />the South limits of the North Mine Area. As materials in Phase 2 (Approximately <br />2.3 acres) are depleted, reclamation will follow in1 acre increments. <br />Phase 3 and future Phases: <br />Mining will be on the West side of the haul road adjacent to Phase 2, and will <br />continue to the West and North with approximately 2.2 acre intervals. <br />Each area will be mined and reclaimed in Phases. The North and Middle Mine Areas <br />contain 31 Phases -containing 2.0.-2.5 acres. The approximate life of each phase will <br />be 2-5 years. <br />All road improvements shall remain and not be reclaimed because they are currently <br />and will continue to be used by the utility companies for ingress/egress and <br />maintenance. <br />