Laserfiche WebLink
Phase IVb Weekly Summary No. 21 Page 4 003-2203 <br />• Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase IVb OSA met the project specifications. <br />Laboratory Tests <br /> <br />• <br />Golder obtained QA samples of Soil Liner Fill (SLFb-12 through SLFb-14), Select Drain Cover Fill <br />(SDCFb-01), and Drain Cover Fill (DCFb-06) and performed index testing to verify suitability of <br />materials used. Laboratory testing is pending and will be presented in next week's report. <br />Meetines <br />CC&V held a Weekly Contractors meeting on June 10, 2003. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on June 17, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Kimberly Finke Morrison <br />Project Resident <br />Phase lVb 2l JuneB-1uM1420032 doc Golder Associates Inc. <br />