My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 21 Page 3 003-2203 <br />• 105 were deployed, seamed, and pressure tested by Poly-Flex. Destmctive fusion and extrusion seam <br />samples DFb-31 through DFb-33 and DXb-09 through DXb-11 were marked and removed. Destructive <br />fusion and extrusion seam peel and shear tests on 100-mil smooth LLDPE geomembrane deployed <br />during this reporting period passed per project specifications. <br />A map of the azea worked during this reporting period is provided in Attachment C. <br />Phase IVc <br />Ames performed no construction activities in the Phase IVc area during this reporting period. <br />Field Monitoring and Testine Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed the placement of secondary and tertiary HVSCS piping in the Phase IVb PSSA and <br />Phase IVb OSA, verifying construction per the project plans. <br />Golder visually observed the placement of DCF in the Phase IVb PSSA and OSA areas. Golder <br />CQA monitors (one monitor per dozer when dozers are greater than 50 ft apart) observed DCF <br />placement and verified minimum thickness of 2 feet for finish grade, 4 feet for HVSCS primary pipe <br />locations, 5 Feet for 773 equipment, and 10 feet for haul road construction and equipment. <br />Golder visually observed the placement of SDCF and ore in the vicinity of the Phase IVb vertical <br />risers on a part-time basis. Golder visually observed construction of the HVSCS vertical risers in the <br />Phase IVb sump on a part-time basis. <br />Golder visually observed removal of DCF from the Phase IVa anchor trench and the Phase III toe at <br />Phase IVb tie-in areas. Damage caused to geomembrane was marked for subsequent repair. <br />Golder observed anchor trench excavation in the Phase IVb OSA for proper location and dimension <br />(2' wide by 3' deep), Anchor trench excavation met or exceeded the requirements of the <br />specifications. <br />Golder observed underground working excavations in the Phase IVb OSA on the south side of <br />Substation Hill. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase IVb OSA <br />for subgrade preparation, thickness, compaction, moisture content, and materials. Golder CQA <br />monitor performed 27 nuclear moisture-density tests (SLNb-129 through SLNb-153), and 10 depth <br />verification checks (SLDb-86 through SLDb-95) on SLF placed within the Phase IVb OSA. Two of <br />the nucleaz moisture-density tests (SLDb-139 and SLDb-144) failed to meet project specifications <br />with regard to compaction. The areas were reworked, retested, and met the requirements of the <br />• specifications. The nuclear moisture-density results summary is presented in Attachment B. <br />an,:e,~rozu~~ea-m~,azooaza« GolderASSOCiateSII1C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.