My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:39:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/19/2003
Doc Name
Summary No. 10
From
Golder Associates
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c -GOltl@2 <br />Associates <br />June 10, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 20: June 1 through June 7, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of June I <br />through June 7, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 32° F to 42° F, and highs ranged from 49° F to 75° F. Precipitation was <br />recorded on June 1 and June 4 through June 7. Weather observations were made on six days of this <br />seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb <br />construction. Ames conducted Phase Nb and c construction activities on six days of this seven-day <br />reporting period (June 2 through June 7, 2003). Though Poly-Flex arrived on site six days of this <br />seven-day reporting period, Phase Nb construction activities were conducted on three days (June 2 <br />through June 4, 2003). <br />Phase IVb <br />Ames continued excavation of the Phase Nb / Nc geomembrane anchor trench, excavating <br />approximately 450 feet of northern anchor trench, west of the Loadout bin (LOB) area. <br />Ames completed backfill of the upper Phase Nb PSSA primary anchor trench, backfilling <br />• approximately 200 feet of north primary anchor trench, and approximately 200 feet of south ore slope <br />primary anchor trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.