Laserfiche WebLink
Phase IVb Weekly Summary No. 19 Page 4 003-2203 <br />Laboratory Tests <br />• Golder obtained QA samples of Drain Cover Fill (DCFb-OS) and Soil Liner Fill (SLFb-10) and <br />performed index testing to verify suitability of materials used. The laboratory tests have not been <br />completed by the end of this reporting period. Laboratory results will be attached in the following <br />weekly report. <br />Meetines <br />CC&V held a Weekly Contractors meeting on May 27. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on June 3, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Ron DiDonato <br />• Project Resident <br />u <br />PtwelVb t9Nay25-May31200J.doc Golder Associates Inc. <br />