Laserfiche WebLink
C (~ <br />Terry Tunnel Bulkhead Coats <br />Aaga 3 <br />1 - concrete vibrator ($770 value) <br />@ $30/day 2 $ 60 <br />1 - 1 1/4 yd. LfR) @ $35/hr 100 hre 53500 <br />1 - Porklift @ S20/hr 100 hra $2000 <br />Roller Conveyora($2605 value) <br />@ $250/eo 3 wks $ 250 <br />bIRECT LABOR @ $16.39/hr 890 hre $14587 <br />SOURLY OVERT]I~ COST3 DURING POUR Lump Sne $1598 <br />SALARY COST3 DURING POOR Lump Sure $2183 <br />BENEFITS @ 35i Of Magee $6429 <br />INDIRECT LABOR outside man i <br />hoiatean @ $16.39/t1r 200 bra $3278 <br />BENSPITS @ 351 of wngea $1147 <br />CONTRACP LABOR for Pour $ 864 <br />NATSRIALS: <br />Concrete Mix - 60 Ib bnga <br />3 truckloads @ 770 bags/truck <br />(421 extra) Lump Sun $6679 <br />Delay Set Lump Sum $ 248 <br />Plasticiser Leap Sus $ 136 <br />Typo V Portland Ceneni <br />(94 lb bags) @ $5.60/ea 50 $ 280 <br />Meek during pour Lump Sue 5 3as <br /> SubTOtal $4668{ <br />STRIP FORMS, MOVE EQDIPIIBNT AND GROUT BULEBEAD: (3 men - 12 days) <br />BQUIPMBNT: <br />GD 83 Jackleq (in Misc Costa) <br />Grout Mixer i P:mp ($8500 value) <br />$700/ewt $250/wk 2 weeks $ 500 <br />1 1/4 yd LND • S35/HIt 120 hra $4200 <br />DIRECT LABOR @ $16.39/hr 360 bra $5900 <br />BENEFITS @ 351 of sages $2065 <br />INDIRECT LABOR outside man 6 <br />hoiatman @ $16.39/HIt 240 hrs $3934 <br />BENEFIT9 @ 351 of wages $1377 <br />MATERIALS: <br />Packers a $120.00 ea a S aeo <br />Typs V Portland Cement <br />(94 lb. begs) @ $5.60 ea 20 g 11~ <br /> SubTotal $18568 <br />