Laserfiche WebLink
C <br />Terry Tunnel Bulkhead Coate <br />Page 4 <br />I[ISC. COSTS <br />C~ <br />BNGIli88RING DSSIGx $4535 <br />SNGINSBRING INSPBCTZON (Design Bngineer) $x077 <br />MATERIALS TBSTIlfG $ 168 <br />MISC SMALL NAND TOOL USAGE Lump Sun $3000 <br />MISC MATERIALS (ie nail s, bits, wire, eta) Lump Sum $3000 <br />DIS$SL Lung Sun $1500 <br />ar-IIr.nn*CZTY $5000/ao 7 Ip $15000 <br />AT LOCOMOTIVB USAGB $6000/at0 3 ®O $18000 <br />COMPRESSOR U3AGS $3000%0 3 ao $9000 <br />AIR-BBAN a5 Pump Usage $ 400/n0 3 mo $1a00 <br />FLICNT 13 NP Pump Usage $ 540/x0 3 no $16a0 <br />GD 83 JACRLSG $ 375/mo 3 mo $lla5 <br />OUTSIDE L011DSR $6000/so 3 mo $18000 <br />SAFBTY SUPPLI89 Lump Sun $ZQQQ <br /> 3uDTota1 S79a25 <br />PLACB LIMESTONE AT BULKHEAD AND 9CRBBN DRIFT TO XBBP DSBRZS PROM BULKHEAD <br />PIPB INTAKE: (5 aen - 5 days) <br />SQUIPMBNT: <br />1 1/4 yd L!ID @ $35/Rr 50 hrs $1750 <br />Forklift @ gao/hr 50 hra $1000 <br />DIRECT LABOR @ $16.39/hr 250 hra $4098 <br />BENEFITS @ 35t o! xages $1434 <br />ZMDIRSCT LABOR outside aan i <br />hoistnan @ $16.39/hr 100 hrs $1639 <br />BENEFITS @ 353 0! wages $ 574 <br />t_l~ ~~ ~~fi <br />Lime (8000 lbe) $ 587 <br />Liaestone (55000 lbe) $1549 <br />Screen Lug gun S <br />SubTOtal $12831 <br />