Laserfiche WebLink
~... C~ <br />Tarry Tunnel Bulkhead Coate <br />page 2 <br />MATBRIALB: <br />Timber: <br />8"x8"x16' 843 (1450+p81) @ 183.03 12 $2196 <br />2"x6"x14' 849 (1800+ps1) @ 515.86 24 $ 381 <br />2"x12"x14'S4S (1000+psi) @ $18.75 8 $ 150 <br />8" DRI8C0 pipe Mith flanges @ $8.39/Pt 50 $ 420 <br />j10 Rabar GR60 Y 40' @ $66.31 14 $ 928 <br />j6 Reber GR 60 x 60' @ $14.22 9 $ 128 <br />Concrete Blocks (pipe support)@ $252 L8 1 $ 252 <br />6" $ch. 80 316E 98 pipe x 11' with 300j <br />flange, 15oi flange and 3 seep rings 1 $2250 <br />1" 3ch. 80 316E 38 pipe (11'length)~ <br />w/ couplings, seep collars, fittings, <br />valves and pressure gauge. 1 $ 618 <br />6" 316E 38 RITX Gate Valve -Class 300 1 $3986 <br />Hiac bolt packages and gaskets 1 $ 155 <br />Freight S z$a <br /> SubTOtal 6855 <br />BRACB Bt1LRREAD: (3 aen - 4 dayes 1 welder - a days) <br />SgUIPIffi7T: <br />9Pelder and Torch @ $100/day 2 S 200 <br />GD 83 Jackieg (in Nisc Costs) <br />DIRSCT LABOR @ $16.39/hr 140 $2295 <br />BSNSFITB @ 35i of wages $ 803 <br />INDIRBCT LABOR outside men i <br />hoistran ! $16.39 80 $1311 <br />HBRBFITB @ 35t of wages S 459 <br />MAT~tL#LSi <br />Angle 5/16"x4"xa" $4.23/LF 70' $ 296 <br />je Threadbas GR 60 @ $1.36/LF 120 LP $ 163 <br />je Bevel and Flet ileshers @ $1.01/pair 70 $ 71 <br />2" schedule 20 pipe @ $3.70/LF 40' $ 148 <br />Celtite @ $27.04/case 1 <br /> 8ub~tal $5827 <br />98T UP AND FOUR BULRHBAD: (5 nen-30 dnys; 13 ran, 4 staff-2 days + overtire) <br />6pUIPMENT: <br />2 - 9 cu.ft.mixers($5822 value) @ $500/mo 3 wke $ 500 <br />1 - Auger feaQ ($2800 value) @ $250/ro 3 Nke $ 250 <br />1 - M20 Reed Concrete Pump (539,786 value) <br />@ $2000/Lo 3 wka $2000 <br />w/ 150' - 4" concrete pipe and hose <br />($4211 value) @ $350/ro 3 vke $ 350 <br />