Laserfiche WebLink
CIRCES Cost Est'mat'na Software <br />WHEEL LOADER•LOAD AND CARRY WORK <br />Agency or organization name <br />Task k: 004 Slate:COlo2tlo Pennitfjob k: M-1977-170 <br />Date: OU29p002 County:CheHee Abbreviation :none <br />User. JOt $IIe:BU(d(d Grave(Pit Filenama:Mt]0-OOa <br />Permit ar other job action :Phased Reclamation <br />Task description :Replace growth medium in wash pond area <br />HOURLY EQUIPMENT COBT <br />- - ~ ~ ~ - -MATERIAL QUANTRIEB - ~- _ <br />Initial <br />Basic machine:CAT 936Fs1tl. liH (1995( Horsepower: 140 <br />AdaUmam no.l:ROPS Cab Shik basis: lper day <br />Ownership cosMoun 512.60 Cost data source: (CRGJ <br />Operating cosUhour: 519.22 100%iob utilization <br />Operator wsUhour. $2199 <br />Total unft cosuTOUr: $59.60 Total fleet cosVhour: 559.80 <br />volume: 4,302 CCY <br />Swell Final <br />factor: 1,215 volume: 5,227 LCV <br />Source of quentiytake-ofl :calculation <br />Source of estimated swell factor: program <br />(Cat HB) <br />I oatler Cvda Tima Unatllustetl basic cycle time (load, dump, maneuver) : 0.490 minutes <br />Cycle Time Factors Factor (min.) Source <br />Matarial: Maferiarupro t/e'diemeter 0.020 (Cef HB) <br />Stockpile : OUmped by truck 0.020 (Cat HBJ <br />Truck ownership: Common ownership of (rucks andloaders -0.040 (Cef HB) <br />Operation : Cwsranroperetion -0.040 (Cat HBJ <br />Dump target Nominal target 0.000 (Gat HB) <br />Net cycle time adjustment: -0.040 minulea <br />Adjusted basic cycle time: O.d50 minutes <br />Rollins Res'stance -Road Contlitions <br />Haul :Rutted dirt, little maintenance, no wafer, 2'rire peneva(ion <br />Retum :Rutted dirt, fttle maintenance, no wafer, 2' are penefmGw <br />Haul antl Retum Time Length Grade res. Rolling res. Total res. I Travel time ~ Data <br />0.00 <br /> Total hovel time: 1.238 minutes <br />t oatler Bucket ana 'N Total cyda time: 1.686 minutes <br />Raletl capacity: 2]5 LCY (heaped) (Cal HB) <br />Bucket fill factor: 0.9]5 Loose material- mixed moist aggregates (95J00 b) <br /> <br />Adjusted capacity: 2.68 LCV <br />Job Cond't'on Congdon Factors Source <br />Bite altitude: ],1]0 lest Altilutla adjustment lactoc 1.00 (Ce(HBI <br /> Job efficiency facfon 083 (1 shiNday) <br /> <br /> Net correction: 0.&3 multiplier <br />Unatljustetl hourly unit production: 9531 LCVMr <br />Adjusted hourly unit production: ]9.1f LCVMr (Cef HB) <br />Adjusted hourly fleet production : 79.11 LCYMr <br />JOB TIME ANO COBT <br />Fleet size: 1 Loatler(s) To[el job time: 66.07 Hours <br />Unit cost 5B. ]56 /LCV Total job cast $3,987 <br />