Laserfiche WebLink
CIRCES Cost EstlmatinD Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />Agency or organization name : OMG <br />Task N: 005 Stale: Colorado PermiU7ob N: M-1977-170 <br />Data: 01r29/2002 County: Chaffee Abbreviation:none <br />User: JD1 Site:BUlala Gravel Pit Filename: Mf]0-005 <br />Permit or other job action :Phased Reclame6bn <br />Task tlescripti0o :6dLMl/I Welsh PORAS <br />Basic machine: CAT 936E Std. lift (1995) Horsepower. 140 <br />AHachmenf no.l:ROPS Cab Shill basis: lper day <br />Cast Breakdown: Ownership cosVnour: 512.60 Cost data source: (CRG) <br />Operating cosVhour $19.22 100 % job utilization <br />Operator cosVhoun $2799 <br />Total unit cosuhour $59.80 Total fleet cosVhour. $59.80 <br />MATERIAL OUANTRIES <br />Initial Swell Final <br />volume: 4,335 CCY factor- 1.125 volume: 4,877 LCY <br />Source of quantity take-ott: calculation <br />Source of estimated swell factor: program <br />HOURLY RRODUCTION <br />(Cat HDJ <br />Loatler Cvde Time Unadjusted basic cycle time (load, Oump, maneuver): 0490 minutes <br />Cycle Time Factor Factor (mint Souma <br />Material: Material t/e•ro 3/d•diameter -0.020 (Cat HBJ <br />Stoekpila : Oumpedby truck 0.020 (Cat HB) <br />Truck ownership : Common ownership of trucks andloaders -0.040 (Cat HB) <br />Operation . Cmstanr opera:im -0.090 (Gat HBJ <br />Dumplarget: Nominal target 0.000 (Car MB) <br />Net cycle time atljustment: -0.080 minutes <br />Adlustetl basic cycle lyre: O.d/0 minutes <br />Rollino Resistance -Road Conditions <br />Haul :Ruffed dirt, little maintenance, no water, 2' fire penetration <br />Retum : Ruffed tlirt, liHle maintenance, no wafer, 2'rire peneharion <br />Maul and Retum Tma Length Gratle res. Rolling res. Total res. Travel lime Data <br /> (feet) (%) (%) (%) (minutes) Source <br />Haul route: ]00 -5.00 5.00 0.00 0.494 (Cat HB) <br />Rehm route : ]00 5.00 5.00 10.00 OJ4d (Car HHJ <br /> <br /> Total travel lime: 1.238 minutes <br />I oader Bucket Canacirv Total cycle time: 1.648 minutaz <br />Rated capacity: 2.75 LCV (heaped) (Cat HB) <br />bucket fill faMOr: 0.9]5 Loose material -mixed moist aggregates (95-100%) <br /> <br />Atljusled capacsy: 2.68 LCV <br />Job Condit on Correction Factor s Source <br />Site altitude: ],170 feet AHitude adlustment factor: t00 (Cat HB) <br /> Job efficiency factor 083 (l shilf/day) <br /> <br /> Net correction: 0.83 multiplier <br />Unatllusletl hourly unit protluction: 9].63 LCYMr <br />Atljustatl hourly u nitprotluMion: 81.03 LCVMr (Cal HB/ <br />AClusted hourly fleet protluction: 81.03 LCVMr <br />JOB TIME AND COST <br />Fleet site: 1 Lcatler(s) Total lob time: 60.79 Hours <br />Unit wst: SO.T3B 0.CY Total lob cost: $3,599 <br />