My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-22_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2002-02-22_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 3:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
2/22/2002
Doc Name
Financial Warranty Increase
From
DMG
To
Butala Construction Company
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Est'matina Software <br />WHEEL LOADER -LOAD AND CARRY W ORK <br />Agency or organization name : OMG <br />Taskx: 003 Slate:COloredo PermiHOb q:M-1977.170 <br />Date: 01,29/2002 County:ChaNee Abbreviation :none <br />User: /01 Site :Butala Gra vet Pit Filename: M1]0.003 <br />Pertnil or other job action :Phased Reclamation <br />Task descripfon :Replace growth med/um in creosote area <br />HOURLY EOUIPMEt4T COST Basic machine:CAT936F Std. litr (1995) Horsepower: 140 <br />Attachment no.l:ROPS Cab Shift basis: )per day <br />Cost Breakdown: Ownership cosVhour $12.60 Cost data source: (CRC) <br />Operating cosNlour. $19.22 f00%job utilization <br />Operator cosUhcur: $2]99 <br />Total unit cosVhour $59.80 Total fleet cosuhour $59.80 <br />MATERIAL OUANTRIES - _ ~ - - - - ~ - <br />Inilal Swell Final <br />volume: 4,168 CCY factor: L215 volume: 5,064 LCY <br />Source of quantity take-oX :calculation <br />Souree o5 eslimatetl swell faMOnprogram <br />HOURLY PRODUCTION <br />(Cat HBJ <br />l oader Cvcle T'me Unadjusted basic cycle time (load, dump, maneuver): O.d90 minutes <br /> Cycle Time Factors Factor (min.) Source <br /> Material: Material up fo l/e'diameler 0.020 (Cat HH) <br /> Slcckplle . Dumped by truck 0.02D (Cat HB) <br /> Truck ownership: Common ownership o/WCks andloa0ers -0.040 (Cat HB) <br /> Opeation : Constant operation .0040 (Cat HB) <br /> Dumplarget Nominal target 0000 (Cat HBJ <br />Net cyda time adjusMent: -0.040 minutes <br />Adjusted basic cycle time: 0450 minutes <br />Roll'na Resistance - Aoatl Contlhions <br />Haul :Rutted tlirt, little mdinfendnce, no wafe4 2'tir~ penetration <br />Retum :Rutted tlirt, little maintenance, no water, 2'tire penetration <br />Heel and Rwlurn Time Length Gratle res. Rolling res. Total res. `I Travel time Data <br />(feet) I (%) I f%1 I (°/.) I (minutes) I Source <br /> Total travel time: 0.514 minutes <br />Loatler Bucket Caoacirv Total cycle time: 0.964 minutes <br />Raletl capacity; 2J5 LCY (heaped) (Cat NBJ <br />Bucket fill )actor: 0975 Loose material- mixed moist aggregates (95-100%) <br /> <br />Atljustetl capacity: 1.68 LCV <br />Job Condition Correction Factors Source <br />Site altitutle: 71]0 feet Aflituda atljustment factor: 1.00 (Cai HB) <br /> Job efficiency factor: 0.93 (l shi/t/day) <br /> Net correction: D.B3 multiplier <br />Unadjusted houry unit produaion: 166.80 LCVMr <br />Atljustetl hourly unit protluction: 138.44 LCYMr (Cat HBJ <br />Atljustetl hourly fleet protluction: 138.44 LCYMr <br />JOB TIME AND LOST <br />Fleet size: t Loatler(s) Total lob time: 3658 Hours <br />Unit wsl: 50.432 /LCY Total lob wst $2,187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.