Laserfiche WebLink
CIRCES Cost Est'matlna Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />Agency or organization name : DMG <br />Task#: 002 Stale:Ccloratlo Permitlob#:M-1977-170 <br />Date: 0129/2002 County: Chal/ee Abbrevialion:nonB <br />User: JD1 Site: Bufala Gra vet Pit Filename:M170-002 <br />Permit or other job action : Phasetl Reclamation <br />Task eescription :Replace growth medium in new phase 1 area <br />HOURLY EQUIPMENT COST Basic macMnetCAT 936E sitl. lift (1995) Horsepower : 1d0 <br />Attachment no.t:ROPS Cab Shin basis: lper day <br />l`on Breakdown: Ownership cosVhour $12.60 Cosl data source : (GRG/ <br />Operating wsMour: $19.22 100%job utilization <br />Operator cosVhour: $2199 <br />Total unit cosphour. $59.80 Total fleet cosuhcur: 559.80 <br />MATERIAL OUANTTES <br />Initial Swell Final <br />volume: 8,067 CCY feIXCr: 1115 volume: 9,801 LCY <br />Source o/quantity take-oll <br />SOpfpe of estimatetl swell factor <br />HOURLY PRODUCTION <br />(Cat H8) <br />I catlwr Cvde T'me Unadlustetl basic cycle lime (load, tlump, maneuveQ: 0.490 minutes <br />Cycle Time Factors Factor (min.) Soume <br />Material; Maferi®/up f01/B•tliame(er 0.020 (Cat HH) <br />Btockpile: Dumped by !luck 0.020 (Cat HB/ <br />Truck ownership: Common ownership of husks end loatlers -O.OdO (Cat HB) <br />Operation : Carstanr operation -O.OaO (Cat HB) <br />Dumptarget~ Nomina/faryef 0.000 (Cat HB/ <br />Net cycle time edju5tmenC A.O60 minutes <br />Adjustetl bash ryde time: 11050 minutes <br />Roll'nc Ress'~e -Road Condi[or~ <br />Haul :Rutted dirt, IifYle maintenance, no wafer, 2' Lire penehabbn <br />Retum :putted dirt, little maintenance, no water, 2'tire penetration <br />Haul and Retum Time Length Grade res. Rolling res. Total res. Travel time Data <br />(feat (%) (%) (%) (minutes) Source <br />Haul mute: 500 3.00 5.00 8.00 0.589 (Cat HB) <br />Relum mute: 500 -3.00 5.00 2.00 034] (Cat HB/ <br /> Total travel l'vne : 0.93] minutes <br />Loader Bucket CaoaeM Total cycle time: 1.387 minutaz <br />Rated capacity : 2J5 LCY (heaped) (Cai HB} <br />Bucket fill factor: 0975 Lcose material-mixed moist aggregates (95- 100%/ <br />Adjusted capacity: 2.68 LCY <br />doh Gandition Correelicn Factors Bourse <br />Site altitutle: 7170 feet Altitude adluslmenl factor 1.00 ~ (Cat HB/ <br /> Job efficiency factor. 083 (l shik/day) <br /> Net correction: O.R3 multiplier <br />Unadjusted howdy unit Oraduction : 1 /8.02 LCYMr <br />Adlusted hourly unM protluction: 9630 LCVMr (Cat HH) <br />Adjusted hourly /lest production: 96.30 LCYMr <br />JOB TIME AND COST <br />Fleet Size'. t loader(s) <br />Total ph time : 101.78 Hours <br />Unit wst 50.62[ lLCY Total job cost $6,087 <br />