Laserfiche WebLink
CIRCES Cost EsNmaNnD Software <br />WHEEL LOADER -LOAD AND CARRY WOgK <br />PROJECT IDENTIFlCATION <br /> Agency or organization name : DMG <br />Taskq: 001 State:COloratlo Permitloba: M-1977470 <br />Date: 01/19/2002 County: ChaNee Abbreviation :none <br />User: JD1 Site:Bufala Gravel Pit Filename:Mt]0.001 <br />Permit or other job action : Phasetl Reclamation <br />Task description :Replace Growth Medium In Old Phase 7 Area <br />NGDRLY EQUIPMENT COST Basic machine:CAT936FS(d. IiR (1995) Horsepower: 140 <br />Anachment no.l:ROPS Cab Shia basis: fper day <br />Cost Breakdown: Ownership cosVhour. 512.60 Cost tlata source: (CAGJ <br />Operating cosMOUr: $19.22 100%job utilization <br />Operator wsUhour: $2].99 <br />Total unit cosVhour: $59.80 Total lleet cosUhour. 568.80 <br />Initial Swell Final <br />volume: 6,]22 CCY factor: 1.215 volume: 8,767 LCV <br />Source of quantity take-oH: cakvlation <br />Source of estimated swell faclor:prOgram <br />(Cat He) <br />Loader CVCle Tme Unatljuslatl basic cyda time(ICaq dump, maneuver): 0.490 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Materaa/up to l/B'tliameler 0.020 (Cat HBJ <br />Slockpile: DUmpetl by truck 0.020 (Cd(HB) <br />Truck ownership: Gammon ownership of trucks and loatlem -0.040 (Cat HB) <br />Operation : Cmstenr operation -0.040 (Gat HBJ <br />Dump target: Nominal target 0.000 (Car HB) <br />Nat cycle time adlustment: -0.040 minutes <br />Adlustetl basic cycle time: 0.450 minutes <br />Roll'no Res'stance -Road Lond'o <br />Haul : Rvttetl dirt, Irdle maintenance, nc water, 7 Lire penetration <br />Remm : Rutted dirt, little maintenance, nc water, 2'tire penetrerion <br />Haul and Re[um Time Length Gratle res. Raling res. Total res. Travel time Data <br />(feet) (%) (%) (%) (minutes) Source <br /> Maul route: 500 2.00 5.00 L00 0.540 (Cat HB) <br /> Retum route: 500 -2.00 5.00 3.00 0.363 (Cat HB) <br /> Total travel time: 0.903 minutes <br />Loader Bucket CaoaciN Total cycle time: 1.363 minutes <br />Ra[etl capacity: 2J5 LCV (heapetl) (Cat HBJ <br />Bucket fill factor: 0.9]5 Lowe material-mixed moist aggregates (95- I00%J <br />Adjusted capacity: 2.68 LCV <br />Job Condition Correction Factors Source <br />Site aAitude: ],1]0 feet Albluda adlustment laclar: 1.00 (Cat HBJ <br /> Job efficiency factor 0.83 (l shik/dayJ <br /> Net correction: 083 multiplier <br />Unatllustetl hourly uni[protluc[icn: 118.90 LCVMr <br />Adjusted hourly unit prctluction : 98.69 LCYMr (Cat HBJ <br />Adlustetl hourly fleet production: 98.69 LCVMr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 82.76 Mours <br />Unit cost: $0.606 iLCV Total lob cost: $4,949 <br />