My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36901
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:05 PM
Creation date
11/21/2007 3:18:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
9/1/2004
Doc Name
Pattern of Violations Letter
From
DMG
To
Peabody Energy
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine. Permit No. C-1994-082.Outstandine Permittine and Insnection Issues <br />TR-25 <br />11/10/03 Application Submitted <br /> • Revised post-mining topography <br /> • Revised reclamation schedule <br /> • Additional postmine channel PM-13 design (submitted <br /> after channel was built) <br /> • Request for Delay in contemporaneous reclamation <br />11/19/2003 Revision deemed complete <br />12/30/03 Division preliminary adequacy review <br />01/04/04 SCC decision extension request <br />3/29/04 SCC response <br />3/29/04 SCC decision extension request <br />4/22/04 Meet at Seneca office to explain DMG concerns <br />4/22/04 SCC decision extension request <br />4/28/04 DMG 2"d adequacy summarizing remaining issues <br />7/1/04 SCC response <br />` <br />7/14/04 DMG 3 <br />adequacy <br />7/28/04 SCC Decision extension request <br />9/24/04 Decision deadline <br />Yoast Inspection Report Issues - <br />Contemporaneous reclamation. Approved plan does not match the proposed plan in <br />TR-25 and has backfill grading deadlines for this year. The backfill and grading plan has <br />been changed with TR-25 including the addition of new variance azeas, but has not yet <br />been approved. <br />PM-12 post mine channel for the lazge gully between new Pond O11A and Pond 011 <br />should be completed by the end of this field season. This azea was one part of NOV- <br />2003-006 and Cessation Order CO-2003-011. Abatement required a plan for channel <br />design. Roy Karo indicates that the work is completed, but it has not been inspected. <br />Armand Draw-NOV CV-2004-002 is pending. The gully between Culvert YB-b and <br />Pond 010 was inspected in August and has been successfully repaired. Abatement Steps <br />No.'s 2 and 3 have not been successfully completed. Culvert YB-6 remains to be <br />replaced and erosion repair and riprap placement needs to be completed below <br />culverts YB-6 and EX-4 in order to terminate the violation. The site of the violation <br />will be inspected on or before September 28, 2004. <br />Slide above Pond 012 continues to be an active slide azea. The entire azea will be <br />regraded. SCC has been requested to re-grade the area above Pond 012 to no steeper than <br />3:1. If the Pond 012 capacity is impacted, enforcement actions will be taken. <br />Post mine channels should be constructed following the final grading of spoil and not <br />delayed until after runoff has severely damaged the graded areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.