Laserfiche WebLink
Seneca Coal Comaanv Enforcement Acfions 2000-Present <br />Yoast Mine <br />The Division is evaluating a pattern of violations for the twelve month period from July <br />2003-June 2004. <br />Inspection Date Enforcement Action Topics <br />August 8, 2001 CV-2001-009 Blasting <br />October 23, 2001 CV-2001-013 Blasting <br />July 21, 2003 CV-2003-006 North Pit Reclamation- Topsoil, Excessive <br /> erosion and Sediment Control <br /> CV-2003-007 Contemporaneous Reclamation-backfilling <br /> and grading, topsoiling and seeding <br /> CV-2003-008 Slides and other damage <br />October 22, 2003 CO-2003-011 Failure to abate CV-2003-006 <br /> CO-2003-012 Failure to abate CV-2003-007 <br />June 30, 2004 CV-2004-002 Sediment control and Excessive erosion <br /> (Abatement pending) <br />Seneca II-W Mine <br />The Division determined that a pattern of violation existed from May 24, 2000-May 23, <br />2001. SCC was not assessed intentional conduct for any of the violations. The Division <br />did not issue a show cause order. Another pattern of violations may be considered if <br />additional enforcement actions are taken before November 18, 2004. <br />Inspection Date Enforcement Action Topics <br />May 24, 2000 CV-2000-005 Topsoil <br />September 28, 2000 CV-2000-007 Sediment control <br />January 30, 2001 CV-2001-002 Topsoil, sediment control and explosives <br />May 23, 2001 CV-2001-012 Topsoil and sediment control <br />April 16, 2003 CV-2003-002 Road drainage <br />April 16, 2003 CV-2003-003 Road drainage and backfilling/grading <br />November 18, 2003 CV-2003-014 Backfilling/grading and permit compliance <br />November 18, 2003 CV-2003-015 Revegetation and permit compliance <br />Seneca II Mine <br />Inspection Date Enforcement Action Topics <br />June 10, 2003 CV-2003-005 Permit compliance (reclamation schedule) - <br />topsoil and revegetation <br />