Laserfiche WebLink
<br />EXIftBTT E <br />RECLAMATION PLAN <br />23 ROAD PIT <br />AMENDMENT #3 <br />PERMTT # M-79-089 <br />After mining has been completed, the Amendment #3 azea will be <br />reclaimed as industrial property with a pond along the south side of the <br />property. The north portion of the property will contain approximately 25 <br />acres and will be backfilled to neaz its present elevation and sloped to drain <br />to the south into the proposed pond. Excess overburden from the south area <br />will be used to backfill the north portion of the pit. The south portion will <br />be connected to three existing ponds to form one large pond containing <br />approximately 56 acres. See Exhibit F. <br />Slopes and disturbed azeas azound the pond will be covered with topsoil to <br />a depth of 6 to 8 inches and seeded per NRCS recommendations. See <br />Exhibit I. Fertilizer and straw mulch will be applied to those areas that aze <br />seeded. <br />