My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-13_REVISION - M1979089 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979089
>
2002-03-13_REVISION - M1979089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:27 PM
Creation date
11/21/2007 3:07:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
3/13/2002
Doc Name
Amendment Application
From
Grand Junction Pipe & Supply Co.
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E~rrD RECEIVED <br />MINING PLAN MAR 1 3 2002 <br />23 ROAD PIT piYision of Minerals and Geology <br />AMENDMENT #3 <br />PERMIT # M-79-089 <br />The purpose of this Amendment is to add 52 acres to the existing Pemut. The area to be added <br />is located on the west side of 23 Road in Section 6, Township 1 South, Range 1 West of the Ute <br />Meridian. See Exhibit C. <br />The total are to be mined under this amendment is 47.4 acres, with the remaining acreage <br />consisting of setbacks. Approximately 40 acres of the azea to be added is comprised of irrigated <br />cropland with the remaining area being the old processing site from the original Permit, which <br />is presently being used by Mesa Rock for stone processing and storage. <br />The azea will be mined in three Phases. Phase I consists of the azea north of the processing site. <br />Mining will start on the north side adjacent to River Road and proceed to the south. Phase II <br />which is located south of the processing site will be mined next. Phase III, the processing site <br />area, will be mined last. Materia! from Phase III with be stockpiled in the bottom and or <br />stockpiled on the east side of 23 Road. See Exhibit C. Excess overburden from Phases II and III <br />will be used to fill Phase I area back to its original elevation. <br />The overburden on the site averages twelve feet in depth. The depth of the sand and gravel <br />deposit thirteen feet. The underlying material is Mancos Shale. <br />Mining will be done using front-end loaders, hydraulic excavators, dozers and trucks. <br />Mining will start in the summer of fall after all permits have been obtained. The anticipated life <br />of the pit is eight to twelve years. <br />The primary product to be mined is sand and gravel. The material will be used for construction <br />aggregate for roads, pipe bedding and concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.