My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1992066
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992066
>
_REVISION - M1992066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 9:43:26 AM
Creation date
11/21/2007 2:54:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992066
IBM Index Class Name
Revision
Doc Name
Amendment Application
From
Duckels Construction Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF MINERALS & GEOLOGY BOARD PERMIT AMENDMENT APPLICATION <br />REGULAR OPERATION (112) <br />PERMIT # M-1992-066 <br />HOGUE RIVER PIT <br />EXHIBIT D Mining Plan <br />reclaimed in conjunction with removal of the gravel beneath this berm. This <br />operation will be accomplished by starting at the western end, removing a 50 foot <br />section of the berm, mining the gravel underneath, then continuing by pushing the <br />the existing topsoil berm into the mined area and continuing the mining as <br />normally is done in a "strip mine" application. The resulting surface will be as <br />shown on the reclamation plan. <br />In reclamation, the remaining material in the mined area will conform to a pond <br />bottom. The slopes and finished areas will conform to the reclamation plan. <br />There may be an excess of some materials when the pit is depleted. Every effort <br />will be made to sell any remaining excess. <br />By mining in this manner we will remove more than 98% of the existing resource <br />upon completion. <br />E. Current Phases <br />Phase I, consists of approximately 15 acres. Approximately 12 acres have been <br />mined. There are approximately 3 acres remaining to be mined in the final stages <br />of the mining operation. Estimated time to complete unmined acreage is 6 <br />months. <br />Phase II, consists of approximately 10 acres. This phase has been mined <br />completely. <br />Phase III, consists of approximately 6 acres. No mining had been done in this <br />phase. Estimated time to complete unmined acreage is 2.5 years. <br />Phase IV, consists of approximately 7 acres. Approximately 5 acres have been <br />mined. There are 2 acres remaining in this phase unmined. Estimated time to <br />complete unmined acreage is 1 year. <br />Phase V, consists of approximately 13 acres. No mining has been done in this <br />phase. Estimated time to complete unmined acreage is 7 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.