My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-09-18_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:25 PM
Creation date
11/21/2007 2:53:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Letter of Transmittal
From
Muerer & Associates Inc.
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />September 14, 2006 <br />Carma <br />Highland Place 11 <br />9110 East Nichols Avenue, Suite 180 <br />Greenwood Village, Colorado 80112 <br />Attn: Mr. Tyler Packard <br />Re: Quality Assurance (QA) Plan <br />Bayshore Ponds <br />Terracon Project No. 25045300 <br />Siegrist Construction Company M-1982-015 <br />1 ~~rr~con <br />Consulting Engineers 8 Scientists <br />10625 West 1.70 Frontage Road North, Suite 3 <br />Wheat Ridge, Colorado 80033 <br />Phone 303.423.3300 <br />Fax 303.423.3353 <br />www.terracon.com <br />At your request, Terracon is providing this quality assurance plan to be implemented during <br />the construction of the proposed slurry wall at the referenced project. <br />The QA plan will consist of providing confirmatory testing to compare to the QC testing <br />(performed by GEO-CON) in accordance with local or other recognized standards for slurry <br />wall construction. The specific testing to be pertormed will be in general accordance with <br />the recommendations outlined in the "Guide to Specification Preparation for Slurry Walls <br />and Clay Liners as a Component of a Colorado Mined Land Reclamation Permit" prepared <br />by DMG dated September, 2000. The report gives a general outline of the specific tests to <br />be performed, testing frequency, and other design criteria. <br />In general, a minimum of 10% of the frequency of testing to be performed by GEO-CON will <br />be performed by Terracon unless a higher frequency is determined to be necessary or <br />requested by the owner. The total number of tests to be performed will be determined <br />based on the construction schedule and the number of crews working during the <br />construction of the project. <br />At a minimum, the following tests/observations will be pertormed during construction of the <br />slurry wall: <br />1. Trench Depth and Key <br />Measurement of the trench depth to verify compliance with slurry wall <br />design specifications/assumptions <br />• Observation and collection of samples of the bedrock key material to <br />verify that the appropriate bedrock key material has been penetrated <br />Delivering Success for Clients and Employees Since 1965 <br />More Than 80 Offices Nationwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.