Laserfiche WebLink
<br />Quality Assurance Plan <br />Bayshore Development -Weld County, Colorado <br />Terracan Project No. 25045300 <br />Terracon <br />Type of Test Standard Min. Frequency Specified Value <br />Measurement of As per Geotechnical 1 test per 50 feet or as As per Geotechnical <br />Trench Depth Report/ Slurry Wall directed by Report/ Slurry Wall <br /> Design Specs Geotechnical Engineer Design Specs <br />Observation of As per Geotechnical 1 test per 50 feet or as As per Geotechnical <br />Bedrock Key Material Report/ Slurry Wall directed by Report/ Slurry Wall <br /> Design Specs Geotechnical Engineer Design Specs <br />2. Bentonite Slurry To Maintain Open Trench Stability <br />Type of Test Standard Min, Frequency Specified Value <br />Viscosity (at mixer) 1 per shift 40 secs minimum <br />Density (at mixer) 1 per shift >= 64 pct <br />Viscosity (in trench) 1 per shift 40 secs minimum <br /> API Spec. 136-1 >= 64 pcf and a <br />Density (in trench) 1 per shift minimum of 15pcf <br /> lighter than SB <br /> Backfill <br />In addition, review of filtration test procedure and results performed by GEO-(:ON will be performed tlaily. <br />3. Soil-Bentonite (SB) Backfill <br />Type of Test Standard Min. Frequency Specified Value <br />Density API Spec. 13B-1 1 per shift At least 15pcf heavier <br /> than slurry in trench <br />Slump ASTM C143 1 per shift 3 to 6 inches <br />Gradation' ASTM D 1140 1 per 2,000 linear feet 15-50% passing No. <br /> 200 sieve <br />Permeability' ASTM D 5084 1 per 2,000 linear feet 1x10- cm/sec or less <br />'Laboratory Test <br />4. Reporting <br />• Preliminary field reports will be submitted daily to the owner's <br />representative to GEO-CON. <br />• Final field reports will be submitted on a weekly or bi-weekly basis to the <br />owner's representative and to GEO-CON. <br />• Laboratory testing reports will be submitted as completed to the owner's <br />representative and to GEO-CON. <br />• A final summary report including all field and laboratory testing will be <br />prepared and submitted to the owner's representative, GEO-CON, and <br />the Division of Minerals and Geology (DMG) as requested. <br />2 <br />