Laserfiche WebLink
Ms. Deb Gbnima <br />September 18, 2006 <br />Page 2 of 2 <br />3. Enclosed is a revised Slope Protection Plan map that identifies and isolates the <br />areas to receive each of the two types of riprap installation scenarios that will <br />be constructed along the southern berm of the ponds. Tab 4 <br />4. A revised Exhibit L - Rec/amation Costs is included with this letter. These <br />costs include separate spillway costs as well as the construction cost for the <br />drains. Tab 5 <br />5. Enclosed is a copy of a letter that was sent to the Colorado Department of <br />Transportation (CDOTI. Tab 6 This letter has been signed by Michael Siegrist <br />of Siegrist Construction Company (the Operatorl, and Tyler Packard of Carma, <br />and sent to Karla Harding of CDOT. We understand that this letter must be <br />reviewed by a number of people in CDOT's offices, and that we should not <br />expect to receive a response from CDOT before our September 25, 2006 <br />decision date. We have made, and continue to make, every effort to get this <br />letter signed and back to you in a timely manner, <br />We are not requesting any extension to the September 25, 2006 permit decision by <br />the DMG. We look forward to your favorable decision by that date so that we can <br />begin reclamation of this area. In the meantime, please call if you have any questions. <br />Sincerely, <br />MEURER;&~AS~SOCIATES, INC. <br />C~ja • Y~ <br />J Villa, P.E. <br />Project Manager <br />Enclosures <br />cc: Mike Siegrist <br />County Clerk Office <br />Tyler Packard/Brad Davis <br />Fred Tafoya, Carroll & Lange <br />Don Frick, Applegate <br />Levi Denton, Terracon <br />G:\3811\3811-DMG Permit\3811 3rd Rvw ResOCnse Letter DMG.doc <br />