My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35974
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:26 PM
Creation date
11/21/2007 2:52:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Name
FORMAL PUBLIC HEARING CASTLE CONCRETE CO FN M-77-210
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br />1 geotechnical slope analysis and submitting it to the <br />2 division to review stabilizing the slides and erosion, <br />3 reseeding and replacing damaged trees by October 30, <br />4 1989. <br /> <br />5 what we have realized with discussions <br />6 with Castle Concrete--and practically speaking, is they <br />7 won't be able to do those things by OcLOber 30, 1989, nor <br />8 should they, from a practical standpoint or prudent <br />9 standpoint, be expected to because of specific technical <br />l0 issues as to how you best get the trees planted or when <br />11 is the best time to plant and seed. <br />12 As we worked through this with them, I <br />13 think what we would ultimately end up with as an <br />14 acceptable corrective action is essentially the same <br />15 language that's in here, except that rather than having <br />16 the October 30 date, it would state that Castle Concrete <br />17 would do these things according to a plan and schedule <br />18 approved by the division, and that is actually what <br />19 usually happens when we deal with corrective actions is <br />20 that sometimes it's not practical to force people. to do <br />21 certain things by a certain date because weather changes <br />22 or conditions may not be right for reclamation at. those <br />23 particular dates. so we're still working with tt.~em on <br />24 that. <br />25 The second part I guess I want to address <br />
The URL can be used to link to this page
Your browser does not support the video tag.