Laserfiche WebLink
o ~ , <br />' III, Comments - Compliance <br />. ,-, <br />' p:• Below ere Comments oq the inspec'tf"oii:',The Comments includa~discussion of <br />. observettons maaa.,during t~;e Inspection. Comments also describe any <br />enforcement actidhs taken during the inspe=tion and the f+:cts or evidence <br />. supporting the enfgrcement action. <br />• pond had reeee:tlY been discharged. <br />HB-2: •At the time of tl;e inapection,'water from H8.-6 was beintf <br />pumped into MB-Z. Flocculent was being added at the <br />it:let to MB-Z. The other inlet to •HB-2+~Mit<• flowing. <br />Flocculent xas also being added and settling immediately <br />epos entering the pond. • <br />MB-9t .; ':YAt tl:e t,~nte ~f they inappep~ipg Hit-8~held a small mount of <br />eater. '' • ' e i ! 1' i' Y ~~'t t ~ +1 <br />,. HB-4: The operator is considering installing an oil skimmer in <br />HB-4. Iii addition, a gated principal spillway is being <br />' coaeidered.- A revision xould be requires wto install <br />either of :the items. HaY baler located.~across the <br />emergency spillway should be removed, or designs should <br />be provided. <br />HB-6: Water level was over the.gete3 opening, but the pond was <br />not diaehar~ing. • <br />~_ NFl-8: The pond had begun to be cleaned prior to the rainstorm. <br />Haterial pushed.out of the pond should be removed and <br />transported to the refuse pile. This tank began prior to <br />the conelueion of the inspection. Water wa's being pumped <br />to MB-2 .in attempt to further dry out tl:e pond ao <br />' cleaning could continue. <br />' y, <br />,.. <br />~. 1. <br />, <br />•t <br />. <br />., . <br />