My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35957
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:45:25 PM
Creation date
11/21/2007 2:51:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/7/1993
Doc Name
Request for Vacation & Information for NOV
From
ARCO LEGAL
To
DMG
Violation No.
CV1993114
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o ~ , <br />' III, Comments - Compliance <br />. ,-, <br />' p:• Below ere Comments oq the inspec'tf"oii:',The Comments includa~discussion of <br />. observettons maaa.,during t~;e Inspection. Comments also describe any <br />enforcement actidhs taken during the inspe=tion and the f+:cts or evidence <br />. supporting the enfgrcement action. <br />• pond had reeee:tlY been discharged. <br />HB-2: •At the time of tl;e inapection,'water from H8.-6 was beintf <br />pumped into MB-Z. Flocculent was being added at the <br />it:let to MB-Z. The other inlet to •HB-2+~Mit<• flowing. <br />Flocculent xas also being added and settling immediately <br />epos entering the pond. • <br />MB-9t .; ':YAt tl:e t,~nte ~f they inappep~ipg Hit-8~held a small mount of <br />eater. '' • ' e i ! 1' i' Y ~~'t t ~ +1 <br />,. HB-4: The operator is considering installing an oil skimmer in <br />HB-4. Iii addition, a gated principal spillway is being <br />' coaeidered.- A revision xould be requires wto install <br />either of :the items. HaY baler located.~across the <br />emergency spillway should be removed, or designs should <br />be provided. <br />HB-6: Water level was over the.gete3 opening, but the pond was <br />not diaehar~ing. • <br />~_ NFl-8: The pond had begun to be cleaned prior to the rainstorm. <br />Haterial pushed.out of the pond should be removed and <br />transported to the refuse pile. This tank began prior to <br />the conelueion of the inspection. Water wa's being pumped <br />to MB-2 .in attempt to further dry out tl:e pond ao <br />' cleaning could continue. <br />' y, <br />,.. <br />~. 1. <br />, <br />•t <br />. <br />., . <br />
The URL can be used to link to this page
Your browser does not support the video tag.