Laserfiche WebLink
INSTRUCTIONS TO BIDDERS <br />CROSS REFERENCB TO PRIMARY STATEMENTS: <br />Definitions, requirements and limitations affecting the bidding are <br />contained in the various Contract Documents and are not necessarily <br />repeated in these instructions. The following is a partial list of <br />applicable provisions and their locations: <br />Provision <br />Availability of Land <br />Bonds and Insurance <br />Definitions <br />Detailed Description <br />of the Work <br />Liquidated Damages <br />Laws and Regulations <br />Retainage <br />Subsurface Investigations <br />Obtaining Bidding Documents <br />Information of Physical <br />Conditions <br />Location <br />General Conditions and Specifications <br />Detailed Sections <br />Agreement Form and General Conditions <br />General and Supplementary Conditions* <br />General and Supplementary Conditions* <br />Specifications -Detailed Sections <br />Agreement Form <br />General and Supplementary Conditions* <br />Agreement Form and Supplementary <br />Conditions* <br />General and Supplementary Conditions* <br />Invitation to Bid <br />General and Supplementary Conditions* <br />2. PREQDALIFICATION OF CONTRACTORS: <br />Bidders/General Contractors (including all parties of a joint venture, each <br />completing a separate form, but submitting all forms together) are required <br />to submit evidence that they have a practical knowledge of the particular <br />Work bid upon, and that they have the financial resources to complete the <br />proposed Work. A preprinted prequalification request form for use in <br />supplying the required information may be obtained from the ENGINEER. <br />In determining the respondent's qualifications, the following factors will <br />be considered: Work previously completed by the respondent and whether the <br />respondent (a) complies with pertinent experience requirements of SECTION <br />02340 - BENTONITE CUTOFF WALL, (b) maintains a permanent place of business, <br />(c) has adequate plant and equipment to do the Work properly and <br />expeditiously, (d) has the financial resources to meet all obligations <br />incident to the Work, and (e) has appropriate technical experience. <br />Each respondent may be required to demonstrate that no just claims are <br />pending against prior work. No Bid will be accepted from a Bidder who is <br />engaged on any work which would impair his ability to perform or finance <br />this Work. At least 5 days prior to Bid opening, ENGINEER shall transmit <br />to all planholders a list of all prequalified Bidders and CONTRACTORS. <br />Bids received from Bidders (including all joint venture parties) who have <br />not been prequalified will not be opened. A Bid that indicates <br />subcontractors who have not been prequalified to perform work in one of the <br />work areas requiring prequalification may result in rejection of the Bid. <br />* IF APPLICABLE <br />(BOARD OF WATER COMMISSIONERS ) <br />(CONSTRUCT SLURRY WALL AROUND ) <br />(HAZELTINE, ROAD RUNNER REST II) <br />(AND BRINKMANN-WOODWARD GRAVEL ) <br />(RESERVOIRS ) <br />(SP 06700A ) IB-1 <br />