Laserfiche WebLink
ENVIRONMENT. INC. <br />AUBUST 2, 2004 <br />PAGE B <br />Proof are the 12 new well drilled on the mine site since the <br />permit was issued on August 10, 2001. <br />• Recharge structures and test wells are not needed to ". <br />maintain the integrity of the amendment's proposed slurry walls <br />. The slurry wall will block the aquifer preventing the <br />ground water from entering the dewatering area. A recharge <br />structures is intended to reduce the impact dewatering would <br />have on the area surrounding an unlined area that is being <br />dewatered. We anticipate as much as a 4 foot increase in the <br />water table outside the line area. This will increase the <br />amount of water in the groundwater table, not reduce it, and <br />protect the surrounding wells. As noted in response #5, a <br />ditch will be installed and maintained along the south side of <br />the liner to regulate the ground water table and divert his- <br />toric groundwater flow that backs up along the liner to the <br />river. <br />----------------------------------------------------------------- <br />Stanley Odenbaugh <br />Mr. Odenbaugh home is approximately 3300 feet east southeast <br />of the Sharkey's Lake liner. <br />There is no requirement to install the recharge structure and <br />monitoring wells until/unless dewatering is.taking place. No <br />dewatering has taking place to date. Responses are number below to <br />correspond to the order presented in the letter. <br />1. Platte Sand & Gravel LLC is contracting with a construction <br />company to install the wall. <br />2. The engineers hired to do the job. Eventually the Office of <br />the State Engineer will inspect the lined area to confirm the <br />reservoir areas are sealed per state standards. <br />3. Yes. <br />4. The Office of the S <br />what criteria needs <br />The contractor will <br />was build and meets <br />post a 1008 project <br />its job. <br />Late Engineer has guidelines that stipulate <br />to be met for the liner to be approved. <br />be responsible for guaranteeing the liner <br />this criteria. Our contract requires they <br />cost bond to assure that the liner will do <br />5. I can not answer this. <br />6. If he means the one on protecting their wells it remains <br />unchanged. <br />---------------------------------------------------------------- <br />Kristi Plutte <br />Ms. Plutte's home is approximately 6125 feet southeast of the <br />closest slurry wall. Ms. Plutte may not be aware of it, but as can <br />be seen in the questions regarding well protection in her neighbors <br />letters, an agreement and protection plan is in place to protect <br />the surrounding wells. Dewatering of the reservoir area will be <br />north of her property and there will be little or no impact to her <br />