Laserfiche WebLink
Division of Wildlife, the County, the landowners and the DMG to ensure that the reclamation <br />plan is the best possible for achieving the post-mining land use. Portable sanitation facilities will <br />be provided to all workers at the mine site. The waste will betaken off site for treatment in an <br />approved facility. There will be no leech fields or other means of sewage disposal. There will be <br />no new demands on Mesa County services from the additional extraction azeas. <br />A gas line and power line that runs through the property will be avoided and have played a large <br />pazt in determining the configuration of the lakes. <br />9. Asahalt Plant Maintenance & Saill Control <br />An asphalt waste pile will be used to store reject asphalt and any hot mix asphalt (HMA) spills. <br />This pile will be placed in the norkhwest corner of the United property adjacent to the truck <br />scales and classroom, out of the floodplain and 15' away from ground water to prevent any <br />contamination. When that area of the United property is mined, the asphalt waste will all be <br />hauled off-site to the Railhead Site for storage. No topsoil will be stockpiled within the vicinity <br />of the asphalt waste site. A 1' tall berm will surround the waste asphalt pile site. From this <br />location, the material may be hauled off site to an approved disposal area. <br />Weekly inspections will be performed to insure that any and all spills or reject asphalt has been <br />cleaned up. Loaders will transport both the reject asphalt and any spilled HMA to the asphalt <br />waste site. This site is shown on Map C-3. <br />The asphalt plant azea will be kept clear of debris and other waste. <br />IS Road Pit February 07 D-12 <br />