Laserfiche WebLink
dozers, trucks and exc ava tors will be servicttil O^ Ftt1 3s-Orelied ba515 fr(lnl pUrtll blt' SCI'VICC lfUt'k <br />making short visits to the site. Upon r(xlamation, all will be removed tium the site. <br />Power is available from pulls at northwestern side of the permit area which may be used to <br />service the pit dewatering pump. There will he no fence around the operation, since it is inside <br />private property and protected by topsoil helms :(nd fences slung the property boundary. No <br />problems ore expected with vandalism. <br />The opcmtor commits to clearly marking the pcmlit boundary with stakes surveyed on site. The <br />site will use all existing roads to haul the product to its final destination. It is pl(ulned that the <br />material may be used to re-surface existing roads, make concrete, asphalt file roads or provide <br />new base material lilr any new roads within un economic distance to the site. <br />In addition to the listed above facilities. the following arc ancillary to the mining and pnlctssing <br />8011 Y1ULti: <br />- Parking for workers <br />-Equipment storage and maintenance <br />-Portable toilets <br />In pit coatis will be hard paeked Dirt, approximately ?K feet wide and will have ramps at u grade <br />of Gi l: I \% to each minine pit. "fhc roads will lead to the facility area and to I S Ruud. Due to the <br />movement of Facilities throughout the life of the mine. not all roads urr specifically markt~(I on <br />the mine plan. Roads marke(i include: existing roads and access tram pcnnitted area to 1> Road. <br />4_Tg~s~il_and Occrhurden flandlina <br />Overburden and topsoil will only be stuckpilul at the very beginning of Pit I and the beginning <br />ol'Pit 4. In all othty pits the overburden and topsuilyd will be plaecYl in thu immediate previous <br />phase of that pit to be used in redumatiun. <br />i._ • <br />I? Ruud Prl Febl~ulrl• fl7 U-7 <br />