My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-23_REVISION - M2002114 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2007-02-23_REVISION - M2002114 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:44 PM
Creation date
11/21/2007 2:17:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Revision
Doc Date
2/23/2007
Doc Name
Response to PAR
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ~linc Fa:ilitic. and Upcratiun <br />The facilities for this mine site will he portable, allowing them to be moved from pit to pit. The <br />facilities will consist ofa Iwrtablu asphalt plant, portuhlc wck scale, punablc concrete plant, <br />ponablc pumping cyuipmcnt, and portable scale housuoRice trailcv and gcn-set light fixtures in <br />case some urgent work must be done ut night. "nc~se facilities +vill be placed un yet to be mined. <br />or previoush~ mina) pits. The portable crushing and scrcening plant and portable stacker <br />conveyors will be located in each mining pit. Vo night operations ore schalulcd for this site. <br />'fable U-S bclo+v shows a summary of the tanks which will be present onsitc. <br />f 0,000 gallon diesel tank That is pan of the crushin:; plant. <br />i,0(I(1 gallon diesel tank which is pan of the wash plant. <br />2.(1(1(1 gallon tank which is located scar the active pit liir tucling mobile cyuipmcnt. <br />'1'hc ti~llowing list is the best estimate as lu the cyuipmcnt which will be used onsitc thruuglwut <br />the mine life: <br />1'ahlc U-~ <br />Tank <br />Quantity Capacity <br />Containment Type <br />Location <br /> <br />Purl Futitt I 2,000 Gallon Dicscl <br />(:'rusher All tanks with a linen hasin that is <br />Plant I 10,(100 Gallon Uicscl benncd. 110%oftank capacity <br />Wash Plant I 5,000 Gallon Dic,cl <br />All of the tanks and the ongoing procedures for inspe~;tions and maintenance will be in <br />compliance with the SPCC plan Idr the sites To further pruteea hydrirlogic balance, tank <br />inspections and ground imp+xtiuns will occur daily on the site. If any fuel or asphaltic material is <br />cncountcrcd, the gravel material will be recycled through the asphalt plant. Also, the Division <br />will hr rnaiticd in caxc of any spills un site. The portahlc mining cyuipmcnt such as loaders, <br />f 5 /fund Pif Frbrrrun~ 117 D-(~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.