Laserfiche WebLink
?. Slinin~ l'imctahlc <br />The following timetable is a best estimate of the scyuence of operations for the life of the mine <br />after December of 2002 and is bused on mining and selling 600,000 tuns of total product per <br />year: <br />l"able U-J <br />Task q Ucscription Timc \cedcd <br /> Months <br />I Prepare saliment pond attd plac:r berm i 0?5 <br /> along t-70 <br />~ <br />2 Strip topsoil from Pit Ito stockpile ut 0.5 <br /> northwest corner of Pit I <br /> Bring m ponahlc crusher, screen plant, 0?5 <br /> st^ckcrs, truck scale, and style house. <br />_ ---- - - <br />4 ~ Wine Pit I 24.7 <br />i Itc. aim I'itl and mine Pit 2 30.0 <br />fi Reclaim Pit 2 and mine Pit 3 53.3 <br />7 Reclaim Pit 3 and mine Pit 4 72.8 <br />S Rcclnim Pit 4 LO <br />`) Remove all facilities 0.5 <br />I O Reseed mtd mulch wetland ;ue;as 0.25 <br /> Total months 188.5 <br /> Total years 16,7 <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br />mining is undcnaken. \otc: If large contracts arc awarcktl to the silt. production awld increase <br />to the permit maximum, thereby curtailing the life of the pit. On the other hated, if contracts arc <br />Iess than anticipaa~el, the life of the pit could he extended. "ibis table is based an a reasonable <br />projecliun of average production rates. <br />1 s /loot/ Pit lQ~hruun~ II i D-5 <br />